Archive for June, 2008
Monday, June 23rd, 2008
With the upgrade of the rack system in the server room, the back-up system is being moved and reconfigured as well. It will be offline for the next week or so until new equipment can be configured and placed into operation. At that point, a new backup will be made of every staff member’s local [...]
Posted in Network Udates | Comments Off
Monday, June 16th, 2008
As part of a tight schedule for system updates and network infrastructures maintenance, the main server room is having a new equipment rack installed. All of the electronics in the current racks will need to be moved and reinstalled in the new rack. Parts of the network may have connectivity loss for brief periods of [...]
Posted in General Information, Network Udates | Comments Off
Tuesday, June 10th, 2008
During the time frame indicated, the uplinks from the K20 core network to the customer aggregation router seadiscar1 will be upgraded. This work is expected to cause two connectivity disruptions of under ten minutes in length for each attached customer site during the course of the event window.
K20 Network Operations can be contacted if there [...]
Posted in Network Problems | Comments Off
Wednesday, June 4th, 2008
Good afternoon! As we have been sharing with you at Leadership Team for the past 6 months, the district has been working on a security adoption. I wanted to send this update out to keep you all in the loop as to where we are in this process. Please share information with your staff so [...]
Posted in General Information, Network Udates | Comments Off
Tuesday, May 6th, 2008
Due to the time involved in getting files moved to the new servers, many of my support tickets have gone unanswered. It looks as though I am over a major part of the server setup and will be shifting back to primarily working on support tickets. Thank you to all of you how have been patiently waiting.
Posted in General Information | Comments Off
Tuesday, May 6th, 2008
Many of you had noticed that email stopped working the first week of May (4/30-5/2). The problem was caused by the failure of the primary DNS server. Some changes were made to reflect the near completed change of files from Cronus to AD1. When saving those changes, the server failed to respond. Undoing those changes did not alleviate the problem. My [...]
Posted in Network Problems | Comments Off
Tuesday, May 6th, 2008
All of the files have been moved from the Cronus files server on to the AD1 or Active Directory server. AD1 runs Windows 2003 Server and required that certain name be changed. Files with /, \, *. ‘ and more than one period, all had to be renamed. Most of the characters were removed or replaced with [...]
Posted in General Information, Network Udates | Comments Off
Tuesday, April 29th, 2008
The new wireless installation is about 60% complete. Most should see better coverage and more reliable trainsfers. The remainder is expected to be completed next school year.
Posted in Network Udates | Comments Off
Tuesday, November 27th, 2007
INVOLVING: K20PLANNED EVENT WINDOWS: 11/28/07 9:00 PM PST – 11/28/07 11:59 PM PST SUMMARY:Routing will be updated to have a more resilient announcement policy towards K20 providers and other work will be done relating to upgrades in the K20 infrastructure.There is no impact expected due to this work and work will be performed in a [...]
Posted in Network Problems | Comments Off
Thursday, November 15th, 2007
There have been a series of problems with the network over the past few days this week. — Starting Tuesday morning, caused by the power outage, the core (main) switch needed to be rebooted. This took me a few hours to figure out and affected everyone on this campus. CCP would not [...]
Posted in Network Problems | Comments Off